Layer 6: European resources
Machine translation. View original in Spanish
The European layer offers the greatest computing power but also the highest administrative complexity. Resources are managed through the European Joint Undertaking EuroHPC and are free for researchers from European public institutions, via competitive calls. CSIC meets the eligibility requirements for all modalities. Its use by CSIC has been limited so far, but is growing, especially following the designation of the Spanish AI Factories.
Supercomputers
- MareNostrum 5 (BSC, Spain): one of the most powerful systems in Europe. BSC coordinates the RES.
- LUMI (CSC, Finland): the system with the highest GPU capacity in Europe, featuring AMD Instinct MI250X. It is highly suitable for large-scale AI.
- Leonardo (CINECA, Italy): a reference pre-exascale system for simulation and AI.
- JUPITER (Jülich, Germany): the first European exascale supercomputer.
- MeluXina (LuxProvide, Luxembourg): a peta-scale system oriented towards AI and industry.
Classical HPC Modalities
- Benchmark Access: for those who have never used EuroHPC and wish to test their codes. Up to three months, with a call always open featuring monthly cut-offs and access within two or three weeks.
- Development Access: for developing, optimizing, or adapting AI applications or algorithms before requesting greater scale. Monthly cut-offs and access within two or three weeks.
- Regular Access: the standard access for mature projects requiring large allocations, for one year and renewable. It has two cut-offs per year and access takes approximately four months. Scientific excellence, impact, and implementation quality are evaluated on a scale of 0 to 5, with a minimum of 3 in each criterion. The scientific access track is relevant for CSIC.
- Extreme Scale Access: for frontier projects on pre-exascale and exascale systems, including JUPITER. One-year allocation, access for up to six months, and only one active principal investigator per organization.
AI Modalities (AI Factories)
AI Factories are infrastructures designed for AI development: state-of-the-art GPUs, fast storage, pre-configured PyTorch, TensorFlow, and JAX, and specialized support. There are 19 in Europe, across 13 countries. Access, also free for research, is requested via the EuroHPC access portal.
- AI for Science: the most relevant for CSIC. It supports scientific applications where AI is the core of the workflow, such as foundation models or generative AI. Six-month allocations, with technical and peer review, and access within one month at most. The 2026 cut-offs are April 30, June 30, August 31, October 30, and December 11.
- Fast Lane Access: up to 50,000 GPU hours for those already familiar with HPC. Always open, first-come, first-served, with approval within four business days and allocations of one to three months. It was originally designed for SMEs, but the academic sector can also use it.
- Large Scale Access: for AI projects requiring more than 50,000 GPU hours, such as training foundation models. Two cut-offs per month, allocations of three, six, or twelve months, and approval within ten business days.
How to Apply
- Create an account on the EuroHPC access portal.
- Choose the modality and system, or accept any available one.
- Prepare the proposal: project and justification, codes and algorithms (with scalability tests for Regular and Extreme Scale), estimated resources, usage plan and timeline, and group track record.
- Evaluation involves technical review and, depending on the modality, scientific peer review.
- If approved, the principal investigator accepts the resource on the portal and contacts the node.
- Upon completion, a final report must be submitted within the following three months.
Access difficulty: complex. The process is in English and evaluation is international. It is advisable to have prior experience in the RES or DRAGO and to start with Benchmark or Development.
Spanish AI Factories
Spain, along with Germany and Poland, is one of the three countries with two AI Factories.
- BSC AI Factory (Barcelona): one of the seven pioneers, from 2024, focused on foundation models for health, energy, and agriculture. Access is via EuroHPC calls, with MareNostrum 5 as the preferred system.
- 1HealthAI (CESGA, Santiago de Compostela): specialized in One Health, with an investment of 82 million euros. It is a nearby entry point for CSIC groups in biomedicine, epidemiology, ecology, or environmental sciences.
The 2027–2028 Gigafactories
The European Commission’s InvestAI initiative aims to mobilize 200 billion euros to create between four and five AI Gigafactories, each with approximately 100,000 AI processors. They target large consortia, elite research institutes, and governments, and will serve to train frontier European models. The EuroHPC regulation underpinning them entered into force in January 2026, and they are expected to be operational between 2027 and 2028.
Spain has submitted a bid with Portugal featuring two nodes: Mora la Nova (Tarragona), with 54 MW in the first phase and 125 MW in the second, and San Fernando de Henares (Madrid). It competes with more than 70 proposals. If selected, CSIC could have preferential access under conditions yet to be defined. Therefore, it is advisable to gain experience in EuroHPC starting now.
Recommended Path for Beginners
- Start with Benchmark or Development Access: light preparation and access within weeks.
- Apply for AI for Science if AI is the core of the project.
- Move to Regular Access or Fast Lane once there is experience, optimized code, and preliminary results.
Next step: industry programs.